dogpossumMainTitle.jpg
You are here: Home > crazed renovating woman bores internet to tears

October 27, 2009

crazed renovating woman bores internet to tears

Posted by dogpossum on October 27, 2009 10:26 PM in the category crafty bastard and dogpossum and domesticity | Comments (0)

terracotta floor tiles

I am nuts for the idea of these tiles atm. They are made of terracotta and they're hexagonal. Click the linky if you want to read more.

I have also started thinking about door handles.

I've never even considered these things before. And we have had to get some housey type things in a hurry. Choosing paint was rushed (but really, there's no choice beyond 'classic white' for a small flat that has dark bits). I could perhaps have chosen a stain for the buttery yellow, knotty pine wood floors we've just had done in a clear satin water based finish.

I am still humming and hawing over painting the woodwork white. I'd like to get this shit done before we move in. But then, I should probably go slow on this stuff so I don't screw things up.

We will also need to get a glazier in to fix a stupidly 'mended' window. And I need to get the dodgy painters in to do one room (the hall over the stairs - the ceiling is >5m and it's over the _stairs_.)

After a while, we'll redo the bathroom (which is really quite important) and then the kitchen (which is less important, but assumed greater importance when we discovered a leak this week).

And then I want to get the space under the stairs made into cupboards or large, pull out drawers. And I want to open out the 'wall' which edges the stair case into think palings or even just leaving it open (and dangerous!). And we will really need some built in bookshelves in the lounge room (we'll cover an entire wall with them).


I like the thought of doing all this stuff. We are doing the painting ourselves, though we got a dood in to finish the floors (I'll let you know what sort of job he did. He's very nice, but you never can tell.) We'll get a plumber to do the plumbing stuff, and a proper tiler to tile because those are jobs you don't want to have to live with if you fuck up. But we've discovered we quite like doing this renovation stuff. The Squeeze is concerned he'll like it too much and we'll be renovating everything, forever.


So, in order of priority, I should be thinking about:

- the woodwork round the doors, etc

- getting all the locks changed, including the window locks. Years as a rental property mean that there are definitely dozens of copies of the keys floating about. So we need new ones.

- the bathroom. I have no idea on this one. We have a good iron bath and a decent toilet bowl, but we need to rip out the shitty shower unit ASAP and the vanity is screwed. It's a tiny room, and very poorly laid out, so we'll need to really think carefully about how we do it. I'd like to keep the bath as it's in very good nick, and I had thought about putting the shower over the bath, but that's not always a good idea, and not great for re-sale. We'll need lots of new tiles and possibly need the ceiling sorted as it does open out into the attic space under the roof. Nice and bright but also DIRTY.

- the kitchen. It needs redoing entirely.

- the built in bookshelves and other assorted fitting and joining and random acts of carpentry. I need a good cabinet maker, I think.

Posted by dogpossum on October 27, 2009 10:26 PM in the category crafty bastard and dogpossum and domesticity

Comments

Post a comment




Remember Me?

(you may use HTML tags for style)